PSU logo

FRASER CENTRE
Corner of Beaver Ave and Fraser St.


Tyler Strange
Structural

  Fraser Centre
Home Student Biography Building Statistics Thesis Abstract Technical Assignments Thesis Research Thesis Proposal Presentation Final
Report
Reflection

Senior Thesis
e-Studio

 
Technical Assignments
 

Technical Report 1 (pdf)

Technical Report 1 is a study of the structural system used at the Fraser Centre. Gravity, wind, and seismic load calculations were also included.

To view Technical Report 1 click on the image to the right.

 

Technical Report 2 (pdf)

Technical Report 2 is a comparison of the existing floor system used at the Fraser Centre and three alternative floor systems. Architectural, cost, and construction impacts were considered in the comparison.

To view Technical Report 2 click on the image to the right.

 

Technical Report 3 (pdf)

Technical Report 3 is study of the lateral system of Fraser Centre. The effects of wind and seismic loadings were included.

To view Technical Report 3 click on the image to the right.

 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Tyler Strange. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
   

This page was last updated on December 6, 2010, by Tyler Strange and is hosted by the AE Department ©2010